All our Windows 2003 servers are located in a state-of-the-art
30,000 sq ft data centre owned and maintained
by Data Foundry and located in Austin, TX. The
data centre features 6 OC-48 connections, configured
redundantly to 6 different major Internet carriers,
providing you with the utmost in connectivity,
availability and reliability. But it doesn't stop
there. The data centre also has four 500 kVA redundant
UPS systems providing 60 minutes of runtime at
full load, fully redundant 1875 KvA diesel generators
providing more than 48+ hours of backup power
before the 6000 gallon tanks have to be refilled,
twenty 30-ton Liebert Air Conditioners, an FM-200
fire suppression system, 24/7 Network Operations
Centre and monitoring, biometric and video security,
and redundant Cisco 12000 series routers and switches.
DigiServ™ Technologies cc equipment is collocated in a
$15 million telco-grade data centre owned and
maintained by Data Foundry and located in Austin,
TX. Originally built in 2001 for Verio, this data
centre is fully redundant and secured in every
way. It is monitored 24x7 by live personnel, and
is scaled to meet growing demands far into the
future. This is truly a first-class facility!
See below for more on the specs of this data centre.
Data Centre Specs |
| Real
Estate Summary |
| Area |
- Total - 30,000 square
feet
- Total Raised Floor
– 21,133 square feet
|
| Power |
| UPS |
- (4) 500 kVA (expandable
to six) PowerWare 9315 parallel, redundant
UPS systems dedicated to the collocation
area provide 30 minutes runtime at full
load
- (2) 80 kVA (expandable
to 3) PowerWare parallel, redundant
UPS systems provide additional UPS infrastructure
dedicated to the POP
|
| Generators |
- (2) 1875 kVA (1,500
KW) Caterpillar diesel generators. Pre built
slab and electrical conduits provide
expansion for third 1875 kVA generator
- 6,000 gallon fuel
capacity onsite allowing 48+ hours runtime
at N+1
|
| Utility |
- 400 Megawatt Austin
Energy sub-station dedicated to Met
Centre. Fully pre built transformer pad
provides expansion capabilities
- (2) ASCO 3,000 AMP,
480 Volt parallel Automatic Transfer
Switches (ATSs), each with redundant
TVSS surge protectors
|
| PDU's |
- PDI 150 kVA Power
Distribution Units (PDUs) capable of
120 Volt and 220 Volt power
|
| Grounding |
- Entire data centre
connected to grounding system
- All external infrastructure
protected by lightning protection system
|
| Security |
| Internal |
- 50 camera, colour,
IP-based CCTV surveillance system records
full-motion video to multiple DVRs and
takes video clips upon every door opening
- Hand Key Biometric
Access Control System, individually
keyed cabinets, cages and optional private
suites provide maximum security and
privacy
- Man traps at all
external doors prevent unauthorized
access
|
| External |
- Concrete filled, steel
reinforced barriers surround exterior.
Foundation is slab on grade with a 5-foot
riser
- Barbed wire fence
surrounds external infrastructure
- External cameras monitor
outside environment
|
| HVAC |
| CRAC's |
- (20) 30-ton Liebert
CRACs (Computer Room Air Conditioners)
with expansion to (30) 30- ton CRAC
units
- Constant temperature
at 72 +/- 2 degrees and relative humidity
at 50%
- CRACs utilize non-water-based
Glycol
|
Glycol
Condensing
Unit |
- (13) 78-ton Liebert
Glycol Condensing Units (GCUs) –
1,014 tons of capacity
- N+2 Redundancy - full
operational mode is maintained in the
event of failure of up to two of the
twenty CRACs and up to two of the thirteen
GCUs
- (2) 50-ton HVAC units
dedicated to UPS and Electric Rooms
|
| Fire
Prevention and Suppression |
| Phase 1 |
HSSD (High
Sensitivity Smoke Detection) sensors continuously
sample the air at adjustable periods of
time for smoke, chemicals and heat. HSSD
can detect fire up to 30 minutes prior to
smoke and/or flame |
| Phase 2 |
Localize
and Isolate the source and use FE36 handheld
extinguishers |
| Phase 3 |
FM-200 building-wide
system. (39) FM-200 systems are distributed
across the entire Data Centre. FM-200 non-conductive
and non-corrosive gas prevents equipment
damage that could otherwise result from
traditional water-based systems. FM-200
is a safe alternative to Halon |
| Phase 4 |
Dual Interlock,
Dry Pipe, Pre-Action Sprinkler System. Pressurized
dual interlock system ensures no water is
above any equipment in the Data Centre |
| Building
Management Control |
| A
building management system control monitors
and reports any abnormal conditions within
the Internet Data Centre. This system can
be remotely operated |
| Telco
Fiber Facilities (at max capacity) |
- OC-48 - Time Warner
- OC-48 - El Paso Global
Networks
- OC-48 - Qwest
- OC-48 - Grande Communications
- OC-12 - Southwestern
Bell
|
| Internet
Infrastructure |
- (2) Cisco 12000 series
routers
- (2) Cisco Catalyst
6500 switches
- Multi-homed, redundant
connectivity to global upstream providers
|
|